Free Trial

Safari Books Online is a digital library providing on-demand subscription access to thousands of learning resources.


Share this Page URL
Help

CHAPTER 6CFR 1910 versus CFR 1926 > Additional Requirements - Pg. 164

164 Chapter 6 Release from Lockout/Tagout Before locked out/tagged out equipment or machinery can be put back into service, a specific sequence of events must be followed. That procedure is outlined in 1910.147(e) and 1910.269(d)(7). The procedure must be conducted by an authorized employee(s). Initially, the work area must be inspected, removing nonessential items and insuring that the machine or equipment components are intact operationally. Also, an inspection of the area must be conducted to assure that all employees have been either removed or relocated to a safe position. The authorized employee(s), or their designated replacement(s), responsible for installing all lockout/tagout devices, will be responsible for removing each (all) lockout/tagout device(s) and notification of all affected employees of that action. OSHA 1910.147(e)(3) provides additional requirements if the authorized employee(s) originally placing the lockout/tagout devices is not available to remove them. It notes that the device may be removed under the direction of the employer, provided that specific procedures and training for such removal have been developed, documented and incorporated into the employer's energy control program. The employer shall demonstrate that the specific procedure provides equivalent safety to the removal of the device by the authorized employee who applied